Bilfinger OKI Isoliertechnik GmbH

Navigation
Fire Protection

Fire Protection

Place for the big image

Commerzbank Arena

Commerzbank Arena

Deutschland

Bilfinger Berger betreibt...
Bilfinger Berger betreibt...
Place for the small images

Fire protection coating

Fire protection coating show reference
Fire protection coating

Project: 

  • Ball TK-401

Services:

Execution Time: September-November 2014
Order Volume: ca. 500 m² 

  • Scaffolding (Bilfinger arnholdt GmbH)
  • Dismantling of leaded fire protection
  • Corrosion protection (Bilfinger arnholdt GmbH)
  • Coating with  Epoxid „Chartek 7“

Project: 

  • Ball TK-401

Services:

Execution Time: September-November 2014
Order Volume: ca. 500 m² 

  • Scaffolding (Bilfinger arnholdt GmbH)
  • Dismantling of leaded fire protection
  • Corrosion protection (Bilfinger arnholdt GmbH)
  • Coating with  Epoxid „Chartek 7“

Vermiculite – Fire protection coating

Vermiculite – Fire protection coating show reference
Vermiculite – Fire protection coating

Project:

  • Undercutting Coker & Top3 / VAK4 & FCC

Services:

  • Execution time: August till September 2010
  • Order Volume: 600m2
  • Fire protection on beams and supportings
  • Fire Protection System: Fendolite MIII
Vermiculite – Fire protection coating

Project:

  • Undercutting Coker & Top3 / VAK4 & FCC

Services:

  • Execution time: August till September 2010
  • Order Volume: 600m2
  • Fire protection on beams and supportings
  • Fire Protection System: Fendolite MIII

Project:

  • Undercutting Coker & Top3 / VAK4 & FCC

Services:

  • Execution time: August till September 2010
  • Order Volume: 600m2
  • Fire protection on beams and supportings
  • Fire Protection System: Fendolite MIII

Malmö Citytunnel Group

Malmö Citytunnel Group show reference
Malmö Citytunnel Group

Services

  • Fabrication and assembly of a smoke-gas and supply channel, related steel structures with dual-layered paneling with Promat fireproofing elements.

Task

In Tracks 71 and 74, we executed a smoke-gas and supply channel for the Malmö City Tunnel from October 2008 to February 2009, providing the necessary steel structure and assembling the fi reproofing elements in dual layers. We also mastered the particular challenge of meeting the customers design requirements. Despite the heavy time pressure, this project was completed on schedule by 28 operatives, who also worked on night shifts.

Services

  • Fabrication and assembly of a smoke-gas and supply channel, related steel structures with dual-layered paneling with Promat fireproofing elements.

Task

In Tracks 71 and 74, we executed a smoke-gas and supply channel for the Malmö City Tunnel from October 2008 to February 2009, providing the necessary steel structure and assembling the fi reproofing elements in dual layers. We also mastered the particular challenge of meeting the customers design requirements. Despite the heavy time pressure, this project was completed on schedule by 28 operatives, who also worked on night shifts.