Bilfinger OKI Isoliertechnik GmbH

Navigation
Cold Store Construction

Cold Store Construction

Place for the big image

Commerzbank Arena

Deutschland

Bilfinger Berger betreibt...
Place for the small images

Reconstruction Ripening Room

Reconstruction Ripening Room show reference
Reiferaum01

Services:

  • New construction of ripening rooms in an existing building
  • Construction with lamination, and paneling, particially with glas-fiber surfaces
  • Doors for cold rooms, fire protection as well as sliding doors
  • Ceiling with panels and anchor ponits
  • Façade with panels and metal sheets  

Execution time: 2010 - 2015

Volume: 6 Bauabschnitte mit je 1500 - 3000m² isolierter Fläche

Reiferaum02

Services:

  • New construction of ripening rooms in an existing building
  • Construction with lamination, and paneling, particially with glas-fiber surfaces
  • Doors for cold rooms, fire protection as well as sliding doors
  • Ceiling with panels and anchor ponits
  • Façade with panels and metal sheets  

Execution time: 2010 - 2015

Volume: 6 Bauabschnitte mit je 1500 - 3000m² isolierter Fläche

Reiferaum03

<p><b>Services:</b></p>
<ul><li>New construction of ripening rooms in an existing building</li><li>Construction with lamination, and paneling, particially with glas-fiber surfaces</li><li>Doors for cold rooms, fire protection as well as sliding doors</li><li>Ceiling with panels and anchor ponits</li><li>Façade with panels and metal sheets &nbsp;</li></ul>
<p><b>Execution time:</b> 2010 - 2015</p>
<p><b>Volume:</b> 6 Bauabschnitte mit je 1500 - 3000m² isolierter Fläche</p>

Services:

  • New construction of ripening rooms in an existing building
  • Construction with lamination, and paneling, particially with glas-fiber surfaces
  • Doors for cold rooms, fire protection as well as sliding doors
  • Ceiling with panels and anchor ponits
  • Façade with panels and metal sheets  

Execution time: 2010 - 2015

Volume: 6 Bauabschnitte mit je 1500 - 3000m² isolierter Fläche